Qualification Test for Assembly Testing\n封装测试工艺认证测试

This examination is designed to assess the understanding of the staff in this training.
本测试的目的是为测试员工对培训的理解程度。
There are two sections. Please write down the correct answer in the space provided. All questions should be answered.
本测试共有两个部分,请在空格内填写正确答案,必须全部作答。

基本信息:
姓名:
部门:
员工编号:
SECTION ONE: QUALIFICATION TEST ON Assembly TESTING  第一节:封装测试工艺资格测试
1.(  )  Which of the following steps are required before the test:以下哪些步骤是测试前需要做的

2. A new set of gloves should be used every(  ) hours during assembly testing operations.

封装测试操作中应每( )个小时更换一套新手套

3. (  ) Before testing IO products, check whether the tray is correct, and which of the following number of grooves in the tray is the number of IO54 products. 进行IO产品测试前需检查托盘是否正确,以下数字托盘的凹槽个数哪一个是放置IO54产品的
4. (  ) KOMV5 and KOMV6 products need to be distinguished before KOM product testing, and KOMV6 products have several dies? KOM产品测试前需区分KOMV5和KOMV6产品,KOMV6产品有几个晶圆
5. (  ) How to prevent foreign matter when testing IO products? 测试IO产品时,如何防止异物产生?
6. ( B ) Which of the following programs is a test program for KOMV5? 以下哪个程序是KOMV5的测试程序?
7.( ) Which of the following is a test program for IO54?
以下哪个程序是IO54的测试程序?
8. (  ) The following KOM products are tested in the correct order 以下KOM产品测试顺序正确的是
①长按comment switch然后按下zebra rubber up/down按钮,机器测试平台左边的升降台下降,点击软件上的short check开始短路测试
②将产品平整的放置在测试平台上,长按右侧common switch按钮然后按下Forward/Backward movement按钮,将产品送入测试位置
③短路测试通过后,长按comment switch然后按下conductive rubber up/down,测试平台右边的升降台下降,点击显示器上的按钮开始开路测试
④测试完成后长按comment switch,依次按下conductive rubber up/down、zebra rubber up/down、Forward/Backward movement按钮,将产品取出


9.(  ) What are the following steps that should be done after the test is complete? 以下步骤哪些是测试完成后应该做的?
Please write the name of the following product请写出以下产品的名称
                                       
SECTION TWO: SAFETY TEST fOR Assembly Packing 第二节:封装测试安全测试
1. () True or False. Testing shall be performed at ESD certified working bench or inspection table. 测试应在有ESD 认证的工作台或检查台上进行。
2. () True or False. When the production staff moves the batch out of the next station, the anti-static trolley should be used to prevent the product from falling当生产人员将在制品批次移出下一个工站时应使用防静电小推车,并且防止产品坠落.
3. () True or False. Wrist strap and ESD type gloves shall be worn while Testing. 测试时,应佩戴腕带和ESD 型手套。
4.() True or False. ESD type smock/garment, with hairnet and facemask shall not be worn at testing. 测试工作站无需穿着ESD 型罩衫/服装,带发网和面罩。
5.() True or False. In manufacturing handling electronic components, ESD is the hidden enemy as there can easily be damaging Electrostatic discharges that a person cannot see or feel.
在搬运电子元件的制造过程中,ESD是一个隐藏的敌人,因为它很容易造成人们看不到或感觉不到的破坏性静电放电。
6.() True or False. If the airflow of the ionizer bothers you, it’s OK to direct it away from the products you are working on.
如果离子风机的气流干扰到你,可以把它从你正在工作的产品上移开。
7.() True or False. The product should be picked up with a vacuum pen for testing.测试时应使用真空吸笔夹取产品进行测试。
8. ( ) True or False. When the product falls on the ground, you can pick it up with your hands产品掉落在地上时,可以用手去捡起产品。
9.() True or False. Defective test products should be placed in the appropriate area and marked to prevent confusion 测试不良品应放置在对应区域,并且做好标记以防混淆。
10. () True or False. Safe handling of units during receipt of lot from previous process should be always observed. 应始终遵守从上一个过程中接收批次时对装置的安全处理。 A. True 是